Projects In Hand

Sr.No. Name of Projects
1 Site Leveling Work at steel plant site NMDC at Nagarnar near Jagdalpur Town in Chattishgarth state 5b Package
2 Section II Earthwork in embankment and Cutting from Ch 26500m to Ch. 35500m= 9 km in the section between Sur wadi Yard ( Excluding) to Kada ( Excluding) on Ahmednagar Beed-Parli Vaijnath New BG Line Project.
3 ASH DYKE Package for NTPC SSEPP. (2x660MW) Solapur Super Thermal Power Project
4 Road and drains work and site Leveling for 5 X 270 MW
5 Thermal Power Project at Nashik M/s. India Bulls.
6 Improvement to Karad Malkapur Nandalapur Yenpe Kokrude Road Sec. Karad Malkapur S.H. 80 km.0/00 to 2/400, Tal-Karad Dist.-Satara, PWD Maharashtra.
7 Lendi Project- Construction of Earthwork C.C. Lining by Paver Machine & Structures of main canal Km.0-19. Laying and jointing M.S. Pipes, appuruntances of Right Side canal take off including Service Road and Inspection Road of project.
8 Four lanning of Road Guhagar Chiplun Karad Jath Vijapur road SH-136(SH-78) km. 158/400 to 159/800 in Tal. Kadegaon, Dist : Sangli, PWD Maharashtra
9 Kokrude Road Sec. Karad Malkapur S.H. 80 km.0/00 to 2/400,
10 Tal-Karad Dist.-Satara, PWD Maharashtra.
11 Four Lanning of Guhagar Chiplun Karad Jath Vijapur road SH- 136 km. 134/000 to 138/200. Section – Supane to Karad City from Airport, Tal. Karad, Dist.- Satara, PWD Maharashtra
12 Four lanning of Road Guhagar Chiplun Karad Jath Vijapur road SH-136(SH-78) km. 158/400 to 159/800 in Tal. Kadegaon, Dist : Sangli, PWD Maharashtra
13 Site leveling for phase-II of Newly acquired Area at Nagarnar Steel Plant at Jagdalpur (Enabling Works Package EW-05b) Chhttisgarh (NMDC Limited)
14 Construction of Earthen Dam, Central Spillway, Head regulator & Approch/Tail Channel across river Wang At Marathwadi, Tal. Patan Dist: Satara (Water Resources Department -MKVDC)
15 Providing Laying and Jointing M.S. Pipes, appurtances & structures for canal off taking from 19.00 to 26.50 Km i.e. upto Andhra Pradesh Border of Lendi Interstate Major Project in Tal. Mukhed, Dist: Nanded (Godvari Marathwada Irrigation Developmen Corporation)
16 Construction of earth work C.C. lining by paver and structures in km 0 to 19 of main canal of lendi interstate project, Tal. Mukhed Dist: Nanded. (Godvari Marathwada Irrigation Developmen Corporation)
17 Construction of Bibi Minor Irrigation Project at Bibi Taluka Patan Dist: Satara On Turnkey Basis (Water Resources Department-MKVDC)
18 Construction Earthwork, structures & field channel (OFD-Part I) Works their on Sukhed Dy. @ Ch. 53/815 of Dhom Balkawadi R.B.C. with Right Minor No.1 & 2 including Sub minors & Tail minor including formation of WUA as per MMSIF Act. 2005 & two years O & M & handing over of Irrigation system to WUA. (Water Resources Department -MKVDC)